PUBLIC WORKS FACILITIES

SMUD East Campus Operations Center

Sacramento, CA

The East Campus Operations Center is home to 750 employees and provides administration, operations, maintenance and storage space for these employees and over 550 utility vehicles. The EC–OC includes an Office Building with space for the line crews and their supervisors, as well as management and engineering offices, and the operations control center. Design features that allowed the campus to achieve net zero energy include: Central Utility Plant with four-pipe distribution system; One Megawatt Photo Voltaic array which also serves as a shade structure for employee parking; horizontal geo-exchange field; and radiant concrete slab ceilings for heating and cooling.
PROFESSIONAL SERVICES
  • Design Architect – Competition Phase
  • Architecture – Support Buildings
  • Interior Design – Support Buildings
  • LEED Consultant
CLIENT
  • Sacramento Municipal Utility District
PROJECT SIZE
  • Office Building: 203,000 sf
    Vehicle Maintenance: 37,020 sf
    Tool/Shop: 49,000 sf
    Warehouse: 43,500 sf
    Electrical Shop: 15,980 sf
    Wash Building: 3,200 sf
    Total Buildings: 351,000 sf
CONSTRUCTION COST
  • $100,000,000 (estimated)
LEED CERTIFICATION

LEED-NC Platinum Net Zero Energy


« BACK TO PUBLIC WORKS FACILITIES